RB Engineering performed the structural engineering services for the latest addition to the Elledge Waste Water Treatment Plant, the Winston-Salem/ Forsyth County, North Carolina Biosolids Storage Facility. 

Our structural services included design and construction plans for a 60,000 square foot biosolids storage facility that included a slab, perimeter wall, foundation and steel walkway design.

Sludge will now be transported via the below conveyor system and stored within the structure.  Trucks can position themselves underneath the conveyor within the structure and quickly load up their tanks. Construction time spanned approximately twelve months.

Clicking any image will open a window with a larger image, and image captions. You can click on either side of the large image to move forwards or backwards through the group of images or use your mousewheel.
 
 

RB Engineering performed the structural engineering services for the latest addition to the Elledge Waste Water Treatment Plant, the Winston-Salem/ Forsyth County Biosolids Storage Facility. RB Engineering's structural services included design and construction plans for the 60,000 square foot biosolids storage facility. Plans for the Elledge Waste Water Treatment Plant included design  for troughs, as well as the slab, perimeter wall, foundation and steel walkway design. The Winston-Salem/ Forsyth County Biosolids Storage Facility construction project, included design and construction plans for a 60,000 square foot facility, including installation of the floor beams.  Here is a look at the inside construction stage of the Elledge Waste Water Treatment Plant, the Winston-Salem/ Forsyth County Biosolids Storage Facility.  The Elledge Waste Water Treatment Plant design and construction plan makes it possible for the trucks to position themselves underneath the conveyor within the structure and quickly load up their tanks. RB Engineering's structural services for the Winston-Salem/ Forsyth County Biosolids Storage Facility included design and construction plans for a 60,000 square foot biosolids storage facility.  Construction time spanned approximately twelve months.
Powered by AgileSite Lite
© RB Engineering, Inc. | All Rights Reserved | Site Map