Project Photos


Over the years, RB Engineering has had the opportunity to participate in several hundred commercial and residential projects.  Our photo gallery gives you the opportunity to get a first-hand view of some of the activities we've been involved in and a look at the way we approach our work.

Click on the project links to the immediate left to see more.

 

The Winston-Salem/ Forsyth County Biosolids Storage Facility construction project, included design and construction plans for a 60,000 square foot facility, including installation of the floor beams.  RB Engineering recommended a structural repair utilizing underground helical piers to stabilize the foundation movement and to address the cause of the foundation cracking; as well as the demolition and re-pouring of the cracked concrete driveway. At the request of Yes! Solar Solutions, RB Engineering performed a structural evaluation of the Cornerstone Professional Complex, Cary, NC. Here is a look at the inside construction stage of the Elledge Waste Water Treatment Plant, the Winston-Salem/ Forsyth County Biosolids Storage Facility.  The Elledge Waste Water Treatment Plant design and construction plan makes it possible for the trucks to position themselves underneath the conveyor within the structure and quickly load up their tanks. RB Engineering's structural services for the Winston-Salem/ Forsyth County Biosolids Storage Facility included design and construction plans for a 60,000 square foot biosolids storage facility.  Construction time spanned approximately twelve months.
Displaying results 13-24 (of 29)
 <  1 - 2 - 3  > 
Powered by AgileSite Lite
© RB Engineering, Inc. | All Rights Reserved | Site Map